To enable the most accurate representation possible, adjustments can be made for the profitability analysis in the Available LCC settings area on the right-hand side of the dialog.

 

Hinweis

If the Available LCC settings area is not visible in the Operating costs dialog, it can be made visible and fixed using the button BtnStecknadelon the right-hand side of the dialog with the Settings label.

 

The following parameters can be defined for a profitability calculation:

 

hmtoggle_plus1VAvailable lcc settings
hmtoggle_plus1: LCC settings
hmtoggle_plus0 Annual operating time

The average annual operating time of the pump is defined in this field. The default setting here is 5600 hours.

 

hmtoggle_plus1Load profile:
hmtoggle_plus1Night setback:
hmtoggle_plus0Correct operating time in case of flow deviation:

Use this option to determine whether the operating time is to be adjusted to a deviation in the specified flow rate for the calculation.

 

hmtoggle_plus1Energy price
hmtoggle_plus1 Evaluation period
hmtoggle_plus0Factor for maintenance in % of the investment amount:

In this field, enter the percentage of the purchase price to be used as the necessary maintenance costs.

 

hmtoggle_plus0Inflation rate (annual inflation rate):

Here you specify the inflation rate. This allows the calculation of costs to be adjusted for inflation, giving you a real estimate of the costs.

 

hmtoggle_plus0Interest rate (for capital investments):

In this field, you specify the average interest rate. This influences the calculation of the depreciation period.

 

hmtoggle_plus1Fuel prices:
hmtoggle_plus0Pump-specific costs (one-off costs in the life cycle) / [...]:

Any costs for disposal and installation can be specified in this area.

 

hmtoggle_plus0Pump-specific costs (annual costs) / [...]:

This section shows the expected annual costs for maintenance, environmental charges, downtime, repairs and other annual costs.